January 12 Update: Water Replacement Project: Stony Run Lane
The crew is moving up Stony Run Lane steadily, but has encountered several impediments (pipe line, gas line, electrical cable for the lights, etc crossing the street) so far. Very impressed with how the crew is able to excavate the trench, handle and install the new water pipes, and to fit them under all these other lines.
January12: the crew will continue their work up Stony Run Lane toward Gardens of Guilford.
The crew appreciates how everyone is respecting the no parking signs posted on the barrels to be out by 7:00 AM all up and down Stony Run Lane and the parking lot out front of the Tuscany.
Again, for next week, if neighbors want to exit the Gardens of Guilford in the morning, it is best to leave before 7:00 AM or consider parking outside elsewhere in the neighborhood.
The crew is likely to stop work right in front of the driveway to the Tuscany garage. So if anyone is going to park their vehicle for the night in the garage, they should probably exit before 7:00 AM before the crew and heavy equipment arrive or consider parking elsewhere.
