April 30 Starting pipe work at 6 PM on the 200 Block of Tuscany
April 30 Starting pipe work at 6 PM on the 200 Block of Tuscany The crew will not be starting work to finalize the two tie ins on Tuscany at…
April 30 Starting pipe work at 6 PM on the 200 Block of Tuscany The crew will not be starting work to finalize the two tie ins on Tuscany at…
Updates: Week of April 20: Water Pipe Replacements There will be no pipe line installation work in the neighborhood until Wednesday the 22nd when the crew will return to complete…
April 14: The crew is connecting the hydrant in front of Tuscany apts to the new water line. April 15: The crew will focus on the tie in at the…
Updates for week of April 13: Water Pipe Replacements April 13: Install and activate the hydrant located between 224 Stony Run Lane and 5G Gardens of Guilford. The crew will…
April 8: Updates, Tuscany Road Pipe Replacements The crew was able to lay 100 ft of pipe today, or about a third of the length of the proposed pipe replacement length. April 9:…
Updates April 7: Pipe Replacement Tuscany Road April 8: the crew will be focused on working on Tuscany Road. The plan is for the crew to start cutting pavement and…
April 6: Work on 200 block of Tuscany Crew started work today on Tuscany Road digging test holes at various sites from Stoneyford to Ridgemede. On April 7, the crew will…